您的位置: 专家智库 > >

国家教育部博士点基金(20090121110022)

作品数:2 被引量:8H指数:2
相关作者:高云龙潘金艳高峰吉国力杨子江更多>>
相关机构:约克大学厦门大学西安交通大学更多>>
发文基金:国家教育部博士点基金国家自然科学基金中央高校基本科研业务费专项资金更多>>
相关领域:机械工程电气工程更多>>

文献类型

  • 2篇中文期刊文章

领域

  • 1篇机械工程
  • 1篇电气工程

主题

  • 1篇电力
  • 1篇序列二次规划
  • 1篇保守
  • 1篇备用容量
  • 1篇POWER_...
  • 1篇ACCURA...
  • 1篇RESERV...
  • 1篇RATION
  • 1篇SCHEDU...

机构

  • 1篇集美大学
  • 1篇西安交通大学
  • 1篇厦门大学
  • 1篇约克大学

作者

  • 1篇杨子江
  • 1篇吉国力
  • 1篇高峰
  • 1篇潘金艳
  • 1篇高云龙

传媒

  • 1篇Scienc...
  • 1篇中国科学:技...

年份

  • 2篇2012
2 条 记 录,以下是 1-2
排序方式:
Optimization based accurate scheduling for generation and reserve of power system被引量:6
2012年
With the improvement of electricity markets,the gradual aggravation of energy shortage and the environment pollution,it is urgent to formulate a new model to precisely satisfy the system demand for energy and reserve.Currently,power system opti-mization dispatching is always formulated as a discrete-time scheduling model.In this paper,we first demonstrate through an example that the upper and lower bounds of spinning reserve offered by a unit,given in the discrete-time model framework as constraints,is unreachable.This causes the problem that the reserve delivery obtained by the discrete-time scheduling model cannot be carried out precisely.From the detailed analysis of the ramp rate constraints,it is proved that the reachable upper and lower bounds of spinning reserve in every period can be expressed as functions of two variables,i.e.,generation level of unit at the start and end of this period.Thus,a new method is provided to calculate the upper and lower bounds of spinning reserve which are reachable in average.Furthermore,a new model based on this proposed method for joint scheduling of generation and reserve is presented,which considers the ability to realize the scheduled energy and reserve delivery.It converts the opti-mization based accurate scheduling for generation and reserve of power system from a continuous-time optimal control prob-lem to a nonlinear programming problem.Therefore,the proposed model can avoid the difficulties in solving a continu-ous-time optimal control problem.Based on the sequential quadratic programming method,numerical experiments for sched-uling electric power production systems are performed to evaluate the model and the results show that the new model is highly effective.
GAO YunLongPAN JinYanYANG ZiJiangGAO FengJI GuoLi
电力系统能量与备用联合优化与精确调度被引量:2
2012年
随着能源与环境危机日益严重,如何建立精确调度模型成为电力市场逐步完善过程中的一个迫切需要研究的课题.目前广泛采用的建模方式是将时间离散化,建立离散时间调度模型,本文首先举例说明离散时间调度模型中所定义的备用容量上、下限存在不可达的情况,即离散时间调度模型中的备用容量上、下限约束条件不严格,从而造成实际调度时存在旋转备用容量无法满足实际需求的情况.通过对机组出力方式与爬坡率关系的详细分析,证明了任意调度时段内机组精确可达的备用容量上、下限与该时段首末时刻机组输出功率相关,并给出了精确可达备用上、下限的计算方法.基于上面的分析结果,建立了能量与备用联合优化与精确调度模型,该模型将能量与备用联合精确调度这样一个连续时间最优控制问题建模成一个非线性规划问题,从而极大地降低了问题的复杂性,避免连续时间最优控制问题所存在的求解困难.应用序列二次规划法对模型进行了数值求解,并对结果进行了讨论,进而验证了模型的有效性.
高云龙潘金艳杨子江高峰吉国力
共1页<1>
聚类工具0