In order to research engineering geological properties of the soil in Zhenlai of western Jilin, especially the dispersivity of soil, the authors carried out the basic physicocbemical test and dispersivity identification test. The results show that the dispersivity of the soil increases with the increase of depth within 0-30 cm (surface soil) ; it decreases as the depth increases within in 30-100 cm. Furthermore, the statistical analysis of the dispersivity indexes and physicochemical propertity indexes show that the DP is positively linear correlated with total soluble salt content, sodium ion content, ESP, pH and organic matter content. Meanwhile, it is negatively linear correlated with clay content, and the linear relationship is better. Through the study of the dispersion mechanism of soil samples, it can be concluded that sodium montmorillonite, higher percentage of exchangeable sodium and high pH are the main reasons for the dispersion of soils in western Jilin.
Post-construction settlement has gained increasing attention because it frequently causes engineering problems. A combined model is a commonly used prediction model that overcomes the difficulty of a single model( i. e., cannot reflect various regulations of settlement at some stages or the entire process). In this study,the correlation coefficient,maximum error values,and other values were obtained according to the fitting and predicted results of a single model. The coefficient of variation was then introduced to determine the weight of each model forming the combination. The proposed model was used to fit and predict for settlement and overcome the issue of utilizing a single model while determining the weight. The fitting predictive effect was also analyzed using the settlement fitting precision results. The fitting precision of optimizing the combination model is high. The predicted data of the post-construction settlement are closer to the calculated value of the settlement monitoring data. Moreover,the proposed model has good practicability,does not require the interval data of settlement,and restricts the model number. Thus,this model can be applied in the engineering field.